Settings
Storage containers on property
Estimated duration of repairs
Deduction for existing storage space
Room Inventory
| Room Name | Regular Boxes | Specialty Boxes | Large Items | Sq Footage | % Filled | Action | ||||
|---|---|---|---|---|---|---|---|---|---|---|
| S | M | L | W | P | O | |||||
% | ||||||||||
% | ||||||||||
% | ||||||||||
| TOTALS | 14 | 25 | 6 | 1 | 5 | 4 | 15 | 840 | ||
| Box Summary | Regular: 45 | Specialty: 10 | Total Boxes: 55 | |||||||
Total Boxes
45
๐ฆ
Specialty Boxes
10
๐
Large Items
15
๐๏ธ
Total Sq Ft
265
๐
Pack-Out Labor Requirements
On-Site Storage
Off-Site Storage
Large/Specialty - CPS LAB
3.25 hours
Large/Specialty - CPS LAB
6.25 hours
Boxes - CPS LAB
3 hours
Boxes - CPS LAB
5.75 hours
Total CPS LAB Hours
6.25 hours
Total CPS LAB Hours
12 hours
Project Duration (4-person crew)
0.25 days
Project Duration (4-person crew)
0.5 days
Supervisor Hours
2 hours
Supervisor Hours
2 hours
Pack-Back Labor Requirements
On-Site Storage
Off-Site Storage
Large/Specialty - CON LAB
3.25 hours
Large/Specialty - CON LAB
6.25 hours
Boxes - CON LAB
3 hours
Boxes - CON LAB
5.75 hours
Unpack Boxes - CON LAB
9 hours
Unpack Boxes - CON LAB
9 hours
Total CON LAB Hours
15.25 hours
Total CON LAB Hours
21 hours
Project Duration (4-person crew)
0.5 days
Project Duration (4-person crew)
0.75 days
Supervisor Hours
2 hours
Supervisor Hours
4 hours
Transportation (Off-Site Only)
Moving Van (24'-27')4 trips
Moving Van (17'-20')4 trips
Moving Van (14'-15')4 tripsโ Most Cost-Effective
Note: Trips rounded to even numbers. Capacity: Large (162 sq ft), Medium (120 sq ft), Small (90 sq ft)
Storage Square Footage & Repair Time
Total Sq FT Required:340 sq ft
Less On Property Storage:0 sq ft
Repair Time:2 months
Total Storage (CPS STORH):680 sq ft-months
On-Site Storage Containers
Job Site Storage 40' Long2 ร 2 months = 4 container-monthsโ Most Cost-Effective
Job Site Storage 20' Long3 ร 2 months = 6 container-months
Job Site Storage 16' Long3 ร 2 months = 6 container-months
Cargo Vans (Supplies):0 days
Note: Capacity: 40' (320 sq ft), 20' (160 sq ft), 16' (128 sq ft). Cargo van only shown for on-site jobs.
Packing Supplies
Bubble Wrap (CPS BWRAP):336 LF
Stretch Wrap (CPS WRAP):1 Roll(s)
Furniture Blankets (CPS PAD):15 blankets
On/Off-Site Storage & Labor Calculations
Storage Square Footage Calculation
((45/3)+10)*3+(840*0.32)
Large/Specialty Labor Pack Out
(15+10)/4
Box Labor Pack Out
45/8
Large/Specialty Labor Pack Back
(10+15)/4
Off Site - Box Pack Back Labor Calculation
45/8
On Site - Box Pack Back Labor Calculation
(45/8)/2
Restaging Contents from Boxes
45/5
Estimate Preview (On-Site Storage)
MOVE OUT
REGULAR BOXES:
CPS
BX<
Small Boxes - Eval, Pack and Inventory
14
CPS
BX
Medium Boxes - Eval, Pack and Inventory
25
CPS
BX>
Large Boxes - Eval, Pack and Inventory
6
Total Regular: 45
SPECIALTY BOXES:
CPS
BXWDR
Wardrobe Boxes
1
CPS
BXMIR
Picture/Mirror Boxes
5
-
-
Other Specialty Boxes
4
Total Specialty: 10
CPS
WRAP
Provide stretch film/wrap
1 Roll(s)
CPS
BWRAP
Bubble Wrap - Add-on cost for fragile items
336 LF
CPS
PAD
Provide furniture lightweight blanket/pad
15
CPS
LAB
Content Manipulation charge - per hour- (Furniture and Special)
3.25 hours
CPS
LAB
Content Manipulation charge- per hour- (Regular Boxes)
3 hours
CPS
LABS
Contents Evaluation and/or Supervisor/Admin - per hour
2 hours
TRANS AND STORAGE
CPS
TRCV
Cargo van and equipment - per day
0 days
CPS
STOPC
Job Site Storage 40' Long
4 container-months
MOVE BACK
CON
LAB
Content Manipulation charge - per hour (Large and Specialty)
3.25 hours
CON
LAB
Content Manipulation charge - per hour (Regular Boxes)
3 hours
CON
LAB
Content Manipulation charge - per hour (Stage Boxes)
9 hours
CPS
LABS
Contents Evaluation and/or Supervisor/Admin - per hour
2 hours
Supporting/F9 Notations
Regular Boxes by Room
Small Boxes:
Living Room - 3
Master Bedroom - 5
Kitchen - 6
Medium Boxes:
Living Room - 4
Master Bedroom - 7
Kitchen - 14
Large Boxes:
Living Room - 1
Master Bedroom - 3
Kitchen - 2
Specialty Boxes by Room
Wardrobe Boxes:
Master Bedroom - 1
Picture/Mirror Boxes:
Living Room - 2
Master Bedroom - 2
Kitchen - 1
Other Specialty:
Master Bedroom - 1
Kitchen - 3
Large Not to be Boxed
Living Room - 6
Master Bedroom - 4
Kitchen - 5
Export Options
File will be named: PackScope_Estimate_ONSITE.MCX or _OFFSITE.MCX
MCX file format is compatible with Xactimateยฎ software. PackScope is not affiliated with, endorsed by, or sponsored by Xactware Solutions, Inc. Xactimate is a registered trademark of Xactware Solutions, Inc.
Instructions
- Enter room details including box counts, large items, and square footage
- Toggle between On-Site and Off-Site storage modes
- Adjust repair time and on-property storage as needed
- Review calculated labor hours, supplies, and transportation needs
- Download a PDF estimate with all line items and CPS codes
This calculator should be used as a guide. Individual circumstances should be evaluated and documented.
